Name | Price | Description |
---|---|---|
Concrete plant SKIP-10S | 34 476 $ | Volume 10 cubic meters m.hour, based on BP-1G-500 skip |
SKIP-15 Concrete Plant | 50 120 $ | Capacity 15 cu m/hour, based on BP-2G-375 skip |
Concrete plant SKIP-25S | 44 767 $ | Volume 25 cubic meters m.hour, based on BP-1G-750 skip |
SKIP-30 Concrete Plant | 64 555 $ | Capacity 30 cu m/hour, based on BP-2G-750 skip |
SKIP-45 Concrete Plant | 83 928 $ | Capacity 45 cu m/hour, based on BP-2G-1200 skip |
SKIP-60 Concrete Plant | 110 259 $ | Capacity 60 cu m/hour, based on BP-2G-1500 skip |
SKIP-90 Concrete Plant | 134 280 $ | Volume 90 cubic meters mhour, based on BP-2G-2250 skip |
Name | Price | Description |
---|---|---|
LENTA-18 Concrete Plant | 58 468 $ | Capacity 18 cu m/hour, based on BP-2G-375 belt conveyor |
LENTA-36 Concrete Plant | 69 609 $ | Capacity 36 cu m/hour, based on BP-2G-750 belt conveyor |
LENTA-54 Concrete Plant | 89 188 $ | Capacity 54 cu m/hour, based on BP-2G-1200 belt conveyor |
Concrete plant ROTOR-60 | 91 662 $ | Prospect 60 cubic meters m. hour, on the basis of BP-1V-1500 tape |
LENTA-72 Concrete Plant | 114 374 $ | Capacity 72 cu m/hour, based on BP-2G-1500 belt conveyor |
LENTA-106 Concrete Plant | 136 027 $ | Capacity 106 cu m/hour, based on BP-2G-2250 belt conveyor |
Concrete plant LENTA-120 | 154 444 $ | Pr-t 120 cu. m. time, based on BP-2G-3000 tape |
Concrete plant LENTA-144M | 189 824 $ | Straight-five 144 cc. m. h, based on the PD-2G-3000 tape |
Concrete plant LENTA-216 | 235 772 $ 273 835 $ | [object Window] |
Name | Price | Description |
---|---|---|
MOBIL-20 Concrete Plant | 37 529 $ | Capacity 20 cu m/hour, based on BP-1G-500 |
MOBILE-25 concrete plant | 38 180 $ | Straight-five 25 cu. m. h, based on the BP-2T-375 |
Concrete plant MOBIL-25P | 45 602 $ | [object Window] |
Concrete plant MOBILE-45 | 59 498 $ | Straight-five 45 cu. m. h, based on the BP-2T-750 |
MCP-20 concrete plant | 55 822 $ | Straight-five 20 cu. m. h, based on the BP-1G-500S |
Concrete plant MCP-45 | 111 789 $ 120 935 $ | Pr-t 45 cu. m. time, based on BPP-3B-1200 |
Name | Price | Description |
---|---|---|
Concrete plant COMPACT 20 | 40 943 $ | Pr-T 20 cc. m time, the base BP-1G-skip 500 |
Concrete plant KOMPAKT-25 | 42 232 $ | Pr-t 25 cubic meters. m hour, based on BP-2G-375 skip |
Concrete plant KOMPAKT-25P | 51 801 $ | Pr-t 25 cubic meters. m hour, based on BPP-3V-375 skip |
COMPACT-30 Concrete Plant | 76 982 $ | Capacity 30 cu m/hour, based on BP-2G-750 skip |
COMPACT-45 Concrete Plant | 97 798 $ | Capacity 45 cu m/hour, based on BP-2G-1200 skip |
COMPACT-60 Concrete Plant | 123 277 $ | Capacity 60 cu m/hour, based on BP-2G-1500 skip |
COMPACT-90 Concrete Plant | 142 020 $ | Capacity 90 cu m/hour, based on BP-2G-2250 skip |
MIXER-45 Concrete Plant | 51 779 $ | Capacity 45 cu m/hour, discharging directly into the truck mixer |
Name | Price | Description |
---|---|---|
Бетонный завод SMART-20 0.0-16 (2х8) | 45 129 $ | Пр-ть 20 куб.м \ кол-во бункеров - 2шт |
Бетонный завод SMART-20 0.0-24 (3х8) | 50 402 $ | Пр-ть 20 куб.м \ кол-во бункеров - 3шт |
Бетонный завод SMART-20 0.0-32 (4х8) | 54 746 $ | Пр-ть 20 куб.м \ кол-во бункеров - 4шт |
Бетонный завод SMART-20 2.0-16 (2х8) | 48 315 $ | Пр-ть 20 куб.м \ высота эстакады -2м \ кол-во бункеров - 2шт |
Бетонный завод SMART-20 2.0-24 (3х8) | 53 588 $ | Пр-ть 20 куб.м \ высота эстакады -2м \ кол-во бункеров - 3шт |
Бетонный завод SMART-20 2.0-32 (4х8) | 57 932 $ | Пр-ть 20 куб.м \ высота эстакады -2м \ кол-во бункеров - 4шт |
Бетонный завод SMART-20 3.0-16 (2х8) | 48 838 $ | Пр-ть 20 куб.м \ высота эстакады -3м \ кол-во бункеров - 2шт |
Бетонный завод SMART-20 3.0-24 (3х8) | 54 111 $ | Пр-ть 20 куб.м \ высота эстакады -3м \ кол-во бункеров - 3шт |
Бетонный завод SMART-20 3.0-32 (4х8) | 58 455 $ | Пр-ть 20 куб.м \ высота эстакады -3м \ кол-во бункеров - 4шт |
Бетонный завод SMART-30 2.0-16 (2х8) | 61 060 $ | Пр-ть 30 куб.м \ высота эстакады -2м \ кол-во бункеров - 2шт |
Бетонный завод SMART-30 2.0-24 (3х8) | 66 333 $ | Пр-ть 30 куб.м \ высота эстакады -2м \ кол-во бункеров - 3шт |
Бетонный завод SMART-30 2.0-32 (4х8) | 70 677 $ | Пр-ть 30 куб.м \ высота эстакады -2м \ кол-во бункеров - 4шт |
Бетонный завод SMART-30 3.0-16 (2х8) | 61 633 $ | Пр-ть 30 куб.м \ высота эстакады -3м \ кол-во бункеров - 2шт |
Concrete plant SMART-30 3.0-24 (3x8) | 66 906 $ | Пр-ть 30 куб.м \ высота эстакады -3м \ кол-во бункеров - 3шт |
Бетонный завод SMART-30 3.0-32 (4х8) | 71 250 $ | Пр-ть 30 куб.м \ высота эстакады -3м \ кол-во бункеров - 4шт |
Бетонный завод SMART-30 4.0-16 (2х8) | 62 285 $ | Пр-ть 30 куб.м \ высота эстакады -4м \ кол-во бункеров - 2шт |
Бетонный завод SMART-30 4.0-24 (3х8) | 67 559 $ | Пр-ть 30 куб.м \ высота эстакады -4м \ кол-во бункеров - 3шт |
Бетонный завод SMART-30 4.0-32 (4х8) | 71 902 $ | Пр-ть 30 куб.м \ высота эстакады -4м \ кол-во бункеров - 4шт |
Name | Price | Description |
---|---|---|
Concrete plant QUICK BETON TWIN-35 | 58 899 $ | [object Window] |
Concrete plant QUICK BETON-55 | 113 778 $ | Straight-five 55 cu. m. h, based on the PD-2G-1200 tape |
Concrete plant QUICK BETON-75 | 136 716 $ | Straight-five 75 cu. m. h, based on the PD-2G-1500 tape |
QUICK BETON-95 concrete plant | 151 362 $ | Straight-five 95 cu. m. h, based on the PD-2G-2250 tape |
Name | Price | Description |
---|---|---|
Concrete plant LEADER-20 | 67 126 $ | Straight-five 20 cu. m. h Winterization |
Concrete plant FLAGMAN-25 | 68 415 $ | Project 25 cubic meters. m.hour, winter version |
FLAGMAN-30 Concrete Plant | 119 785 $ | Capacity 30 cu m/hour, winterized |
FLAGMAN-45 Concrete Plant | 158 600 $ | Capacity 45 cu m/hour, winterized |
FLAGMAN-60 Concrete Plant | 184 079 $ | Capacity 60 cu m/hour, winterized |
FLAGMAN-90 Concrete Plant | 208 439 $ | Capacity 90 cu m/hour, winterized |
Concrete plant FLAGMAN-144M | 336 058 $ | Volume 144 cubic meters m.hour, winter version |
Concrete plant FLAGMAN-216 | 385 490 $ 424 734 $ | Volume 216 cubic meters. m.hour, winter version |
Name | Price | Description |
---|---|---|
Mobile asphalt plant MAZ-20 | 133 191 $ | Productivity 20 tons hour |
Asphalt plant BMZ-80 | 356 529 $ | Productivity 80 tons hour |
Asphalt concrete plant BMZ-160 | 841 220 $ | Capacity 160 tons/hour |
Screen MZ-004 | 20 612 $ | Drive power, 7.5 kW |
Accumulative bunker МЗ-005 | 23 591 $ | Hopper volume, 14 m3 |
Mixing unit MZ-017 | 47 059 $ | Mixing weight of the asphalt mixer 1000 kg |
Asphalt mixer BMZ-80 | 28 108 $ | Productivity up to 80 tons / hour |
Belt conveyor LK 18-0.6 | 11 190 $ | Drive power, 7.5 kW |
Drying drum МЗ-002 | 50 754 $ | End product capacity, 80 t / h |
Inert conveyor batcher DIK-8 | 7 857 $ | Hopper working volume, 8 m3 |
Operator cabin for asphalt plant | 10 366 $ | ABZ management |
Bitumen storage BH-30 | Receiver volume 200 l., pr-t 553 lmin $ | For bitumen at ABZ. Capacity 31 cubic meters |
Bituminous storage BH-45 | 22 515 $ | Under the bitumen at the ABZ. Capacity 45 cubic meters |
Bucket elevator MZ-003 | 34 999 $ | For lifting hot aggregates. Prospect, 100 t / h |
Wet dust collector MZMP-40 | 15 720 $ | For humidification of dust particles and flue gases, |
Cyclone dust collector MZTsP-40 | 14 420 $ | Coarse filter. |
Ready mixture accumulator МЗНР-50 | 57 748 $ | For distribution and unloading from under the mixer of the finished asphalt mix or substandard |
Filtering installation hose MZ-010 |
58 126 $ | For cleaning from dust and flue gases |
Cellulose additive unit MZA-1500 | 5 634 $ | For dosing cellulose additives into an asphalt mixer |
SCP-32 cement silo | 7 980 $ | Under the dust at the ABZ. Capacity 32 tons. |
SCP-52 cement silo | 11 688 $ | Under min. powder at the ABZ. Capacity 52 tons |
Name | Price | Description |
---|---|---|
Concrete plant Mini RBU-10 | 16 944 $ | Capacity 10 cu m/hour, based on BP-1G-450 skip |
Concrete plant Mini RBU-15 | 19 573 $ | Capacity 15 cu m/hour, based on BP-2G-375 skip |
Concrete plant Mini RBU-30 | 28 227 $ | Capacity 30 cu m/hour, based on BP-2G-750 skip |
Name | Price | Description |
---|---|---|
BP-1G-100 Concrete Mixer | 1 932 $ | Loading volume - 100l, finished concrete batch volume - 70l |
BP-1G-300 Concrete Mixer | 3 248 $ | Loading volume - 300l, finished concrete batch volume - 200l |
BP-1G-500 single-shaft concrete mixer | 9 588 $ | Loading volume - 500l, finished concrete batch volume - 333l |
Single-shaft mixer BP-1G-500S | 9 588 $ | Loading volume - 500l, finished concrete batch volume - 333l |
Single-shaft mixer BP-1G-500c | 12 061 $ | Loading volume - 500l, finished concrete batch volume - 333l |
Single-shaft concrete mixer BP-1G-750 | 14 390 $ | Loading volume - 750l, finished concrete batch volume - 500l |
Single-shaft concrete mixer BP-1G-750S | 18 654 $ | Loading volume - 900l, finished concrete batch volume - 600l |
Single-shaft concrete mixer BP-1G-1500 | 26 632 $ | Loading volume - 1500l, ready mix volume for concrete - 1000l |
Single-shaft concrete mixer BP-1G-1500s | 36 580 $ | Loading volume - 1500l, ready mix volume for concrete - 1000l |
Single-shaft concrete mixer BP-1V-1500 | 22 360 $ | Loading volume - 1500l, ready mix volume for concrete - 1000l |
Name | Price | Description |
---|---|---|
BP-2G-375 Twin-Shaft Concrete Mixer | 9 680 $ | Loading volume - 375l, ready mix volume for concrete - 250l |
BP-2G-375s Twin-shaft concrete mixer | 11 700 $ | Loading volume - 375l, ready mix volume for concrete - 250l |
BP-2G-750 Twin-shaft concrete mixer | 14 634 $ | Loading volume - 750, finished concrete batch volume - 500 l |
BP-2G-750s Twin-shaft concrete mixer | 18 898 $ | Loading volume - 750, finished concrete batch volume - 500 l |
Twin-shaft concrete mixer SICOMA MSO 750 |
27 266 $ | Loading volume - 750, finished concrete batch volume - 500 l |
BP-2G-1200 Twin-shaft concrete mixer | 22 107 $ | Loading volume - 1200l, finished concrete batch volume - 800l |
BP-2G-1200s Twin-shaft concrete mixer | 28 634 $ | Loading volume - 1200l, finished concrete batch volume - 800l |
BP-2G-1500 Twin-shaft concrete mixer | 45 045 $ | Loading volume - 1500l, ready mix volume for concrete - 1000l |
BP-2G-1500s Twin-shaft concrete mixer | 53 241 $ | Loading volume - 1500l, ready mix volume for concrete - 1000l |
Twin-shaft concrete mixer SICOMA MSO 1750 |
34 299 $ | Loading volume - 1750l, finished concrete batch volume - 1250l |
Twin-shaft concrete mixer SICOMA MAO 2250 |
39 039 $ | Loading volume - 2250l, ready mix volume for concrete - 1500l |
BP-2G-2250 Twin-shaft concrete mixer | 57 334 $ | Loading volume - 2250l, ready mix volume for concrete - 1500l |
BP-2G-2250s Twin-shaft concrete mixer | 67 595 $ | Loading volume - 2250l, ready mix volume for concrete - 1500l |
Twin-shaft concrete mixer SICOMA MAO 3000 |
43 957 $ | Loading volume - 3000l, ready mix volume for concrete - 2000l |
Twin-shaft concrete mixer BP-2G-3000 | 61 583 $ | Loading volume - 3000l, ready mix volume for concrete - 2000l |
Twin-shaft concrete mixer SICOMA MAO 4500 |
51 551 $ | Loading volume - 4500l, finished concrete batch volume - 3000l |
Twin-shaft concrete mixer BP-2G-4500 | 49 797 $ 63 988 $ | Loading volume - 4500l, finished concrete batch volume - 3000l |
Name | Price | Description |
---|---|---|
Planetary concrete mixer SICOMA MPC 375 |
17 251 $ | Loading volume - 375l, ready mix volume for concrete - 250l |
Planetary concrete mixer SICOMA MPC 750 |
22 298 $ | Loading volume - 750l, finished concrete batch volume - 500l |
Planetary concrete mixer SICOMA MPC 1125 |
58 851 $ | Loading volume - 1125l, finished concrete batch volume - 750l |
Planetary concrete mixer SICOMA MPC 1500 |
35 930 $ | Loading volume - 1500l, ready mix volume for concrete - 1000l |
Planetary concrete mixer SICOMA MPC 2250 |
49 945 $ | Loading volume - 2250l, ready mix volume for concrete - 1500l |
Name | Price | Description |
---|---|---|
Continuous mixer actions CIS-300 |
36 527 $ | Capacity up to 300 t/h |
Name | Price | Description |
---|---|---|
Dosing complex DKP-5 | 9 632 $ | Bunkers 2 pieces of 2.5 cubic meters. m. Installation without foundation |
Dosing complex DKP-10 | 10 523 $ | Bunkers 2 pieces of 5 cubic meters. m. Installation without foundation |
Modular dosing complex MMDC-12 |
15 244 $ 19 022 $ | Bunkers 2 pieces on 4/8 cube. m. Installation without foundation |
Dosing complex DKT-16 | 19 861 $ | Bunkers 2 pieces of 8 cubic meters. m. Installation without foundation |
Dosing complex DKS-16 | 16 260 $ 16 882 $ | Bunkers 2 pieces of 8 cubic meters. m. Installation without foundation |
Dosing complex DKT-24 | 25 134 $ | Bunkers 3 pieces of 8 cubic meters. m. Installation without foundation |
DKS-24 Dosing complex | 20 833 $ 21 365 $ | Bunkers 3 pieces of 8 cubic meters. m. Installation without foundation |
Dosing complex DKT-32 | 29 478 $ | Bunkers 4 pieces of 8 cubic meters. m. Installation without foundation |
Dosing complex DKS-32 | 27 535 $ | Bunkers 4 pieces of 8 cubic meters. m. Installation without foundation |
Dosing complex DCM-40 | 24 212 $ | Bunkers 2 pieces of 20 cubic meters. m. Installation without foundation |
Dosing complex DCM-60 | 30 393 $ | Bunkers 3 pieces of 20 cubic meters. m. Installation without foundation |
Dosing complex DCM-80 | 40 216 $ | Bunkers 4 pieces of 20 cubic meters. m, DI-12, installation without foundation |
Dosing complex DKM-120 | 42 683 $ 50 233 $ | Bunkers 4 pieces of 30 cubic meters. m. Installation without foundation |
The metering range of the DC-24 (mobile) | 26 567 $ | Bunkers 2x12 m3, installation without pit and foundation |
The metering range of the DC-36 (mobile) | 32 705 $ | Bunkers 3x12 m3, installation without pit and foundation |
The metering range of the DC-54 (mobile) | 34 737 $ | Bunkers 3x18 m3, installation without pit and foundation |
17 654 | 50 527 $ | Bunkers 5x8 m3, Own conveyor-feeder on each bunker |
Name | Price | Description |
---|---|---|
BD-7 block of dispensers | 4 672 $ | For: cement 75 kg, water 30 l, chemicals 5 l |
BD-15 Block of Dispensers | 5 805 $ | For: cement 150 kg, water 75 l, chemicals 10 l |
BD-30 Block of Dispensers | 7 098 $ | For: cement 300 kg, water 150 l, chemicals 20 l |
BD-45 Block of Dispensers | 8 368 $ | For: cement 500 kg, water 250 l, chemicals 30 l |
BD-60 block of dispensers | 9 240 $ | For: cement 600 kg, water 300 l, chemicals 40 l |
BD-90 block of dispensers | 11 598 $ | For: cement 900 kg, water 450 l, chemicals 60 l |
Block dozatorov DB-120 | 14 051 $ | Cement: 1200 kg Water 550 l, 80 l chemistry.. |
DVPL-1 water dispenser | 1 496 $ | Flowing type, 1" diameter, with PA |
DVPL-2 Water Dispenser | 1 613 $ | Through type 2" diameter, with PA |
DCH-90 Dry chemical additives dispenser | 3 609 $ | Capacity 1.2 cubic meters hour, power 0,75 kW |
Scales automobile WAC-18 (12 6) | 26 151 $ | Weight 50 tons, the length of the platform 18m |
Fiber dispenser | 7 359 $ | The highest dosing limit for fibers with a bulk density of 123 kg/m³ |
Name | Price | Description |
---|---|---|
PRU manual control panel | 3 146 $ | Hand control, economical option |
PLA semi-automatic control panel | 6 465 $ | Semi-automatic, economy version |
PAM 4.0 SCADA control panel | 6 600 $ | Full automatic expense accounting, reports, remote control |
PA-3.0 SCADA-5.0 control panel with monoblock |
9 135 $ | Full automatic machine. Consumption accounting, reports, remote control |
Video surveillance system | 1 885 $ | For 24/7, continuous monitoring |
Name | Price | Description |
---|---|---|
Rastarivatelʹ big-beg cement RMK-2M | 994 $ | Cement big-bags discharge |
RMK-2MP cement big bag grinder is designed for grinding cement big bag bags | 1 615 $ | 17 654 |
Rastarivatelʹ big-beg cement RMK-2 | 1 012 $ | Cement big-bags discharge |
RMK-2MR cement big bag grinder | 1 110 $ | Cement big-bags discharge |
Rastarivatel URM in the base (b) | 1 993 $ | Cement big-bags discharge |
Cement big bag dispenser RC-6 | 2 841 $ | Unpacking big bags of cement. Increased loading volume – capacity 6 tons |
Rastarivatel big bags with a manual hoist URM (p) | 3 830 $ | Mobile rastarivatel with bootstrapping (with manual winch) |
Rastarivatel big bags with el. URM hoist (s) | 8 399 $ | Mobile rastarivatel with bootstrapping (with a lifting device 2 tons) |
STs-12 Cement Silo | 4 791 $ | Capacity 12 tons, all-welded D 2.3 m |
STs-22 Cement Silo | 5 760 $ | Capacity 22 tons, all-welded D 2.3 m |
Cement silo cell Pocket SMK-22 |
6 852 $ | Capacity 22 tons, all-welded all-welded D 3.5 mm 2.4 m |
STs-32 Cement Silo | 6 834 $ | Capacity 32 tons, all-welded all-welded D 3.5 mm 2.3 m |
Mobile cement silo JTF-35 | 11 377 $ | Mobile, capacity 35 tons |
STsR-35 Cement Silo | 9 043 $ | Demountable, capacity of 35 tons, D 3,5 m |
STs-42 Cement Silo | 7 878 $ | Capacity 42 tons, all-welded all-welded D 3.5 mm2.3 m |
STsR-50 Cement Silo | 10 828 $ | Demountable, capacity of 50 tons, D 3,5 m |
STs-52 Cement Silo | 9 184 $ | Capacity 52 tons, all-welded all-welded D 3.5 mm 2.3 m |
Cement silo MCT-56 | 10 967 $ | Telescopic, capacity 56 tonnes, D 2,3 m |
STs-62 Cement Silo | 10 285 $ | Capacity 62 tons, all-welded all-welded D 3.5 mm 2.3 m |
STs-72 Cement Silo | 12 694 $ | Capacity 72 tons, all-welded all-welded D 3.5 mm 2.3 m |
Cement silo SCU-74 | 14 085 $ | Capacity 74 tons, all-welded D 3.5 mm |
STsR-75 Cement Silo | 12 557 $ | Demountable, capacity of 75 tons, D 3,5 m |
Cement silo SCU-95 | 14 788 $ | Capacity 95 tons, all-welded D 3.5 mm |
Cement silo SCT-95 | 14 736 $ 18 973 $ | Telescopic, capacity 95 tons, D 2.3 m |
Cement silo SCU-115 | 17 927 $ | Capacity 115 tons, all-welded D 3.5 mm |
STsR-100 Cement Silo | 14 245 $ | Demountable, a capacity of 100 tons, D 3,5 m |
STsR-120 Cement Silo | 15 945 $ | Demountable, the capacity of 120 tons, D 3,5 m |
Cement silo SCU-135 | 20 488 $ | Capacity 135 tons, all-welded D 3.5 mm |
STsR-140 Cement Silo | 17 805 $ | Demountable, the capacity of 140 tons, D 3,5 m |
Cement silo SCU-155 | 21 768 $ | Capacity 155 tons, all-welded D 3.5 mm |
STsR-160 Cement Silo | 20 280 $ | Demountable, the capacity of 160 tons, D 3,5 m |
STsR-180 Cement Silo | 24 527 $ | Demountable, the capacity of 180 tons, D 5 m |
STsR-215 Cement Silo | 26 435 $ | Demountable, the capacity of 215 tons, D 5 m |
STsR-250 Cement Silo | 29 829 $ | Demountable, the capacity of 250 tons, D 5 m |
STsR-290 Cement Silo | 34 852 $ | Demountable, the capacity of 290 tons, D 5 m |
STsR-315 Cement Silo | 37 495 $ | Demountable, the capacity of 315 tons, D 5 m |
Cement silo SPS-345 | 46 828 $ | Demountable, the capacity of 345 tons, D 6 m |
Cement silo SPSTS-345 | 34 856 $ | Demountable, the capacity of 345 tons, D 6 m |
Cement silo SPSV-345 | 75 674 $ | Under a wagon, collapsible, capacity 345 tons, D 6 m |
cement silo ATP-410 | 50 522 $ | Demountable, the capacity of 410 tons, D 6 m |
cement silo SPSTS-410 | 61 976 $ | Demountable, the capacity of 410 tons, D 6 m |
Cement silo SPSV-410 | 79 272 $ | Under a wagon, collapsible, capacity 410 tons, D 6 m |
Cement silo SPS-465 | 54 060 $ | Demountable, the capacity of 465 tons, D 6 m |
Cement silo SPSTS-465 | 65 620 $ | Demountable, the capacity of 465 tons, D 6 m |
Cement silo SPSV-465 | 83 467 $ | Under a wagon, collapsible, capacity 465 tons, D 6 m |
Cement silo SPS-520 | 58 618 $ | Demountable, the capacity of 520 tons, D 6 m |
Cement silo SPSTS-520 | 70 048 $ | Demountable, the capacity of 520 tons, D 6 m |
Cement silo SPSV-520 | 87 796 $ | Under a wagon, collapsible, capacity 520 tons, D 6 m |
Cement silo SPU-650 | 85 170 $ | Demountable, the capacity of 650 tons, D 7,6 m |
Cement silo SPUV-650 | 112 194 $ | Under a wagon, collapsible, capacity 650 tons, D 7.6 m |
Cement silo SPU-920 | 99 190 $ | Demountable, the capacity of 920 tons, D 7,6 m |
Cement silo SPUV-920 | 124 087 $ | Under a wagon, collapsible, capacity 920 tons, D 7.6 m |
Cement silo SPV-1160 | 154 252 $ | Dismountable, increased capacity, 1160 tons, D 10 m |
Cement silo SPV-1340 | 161 594 $ | Dismountable, increased capacity, 1340 tons, D 10 m |
Cement silo SPV-1520 | 168 540 $ | Dismountable, increased capacity, 1520 tons, D 10 m |
Cement silo SPV-1700 | 175 774 $ | Dismountable, increased capacity, 1700 tons, D 10 m |
Cement silo SPV-1880 | 184 104 $ | Dismountable, increased capacity, 1880 tons, D 10 m |
Cement silo SPV-2060 | 191 938 $ | Dismountable, increased capacity, 2060 tons, D 10 m |
Cylindrical sector for CMS silage | 2 177 $ | To increase silage CMS |
Name | Price | Description |
---|---|---|
Cement filter with pneumatic cleaning AIRFILL25 | 1 517 $ | Area 1800 m³hour, filtering surface 24 sq.m |
Cement silo filter with vibration cleaning FCS-14 | 784 $ | Area 1400 m³/hour, filter surface 14 sq.m, vibration cleaning |
Stainless Steel Cement Filter FCS-14NEON with mounting ring |
839 $ | Area 1400 m³/hour, filter surface 14 sq.m, vibration cleaning |
Stainless Steel Cement Filter FCS-24NEON with set ring |
963 $ | Capacity 2200 m³/hour, filter surface 24 sq.m, vibration cleaning |
Butterfly valve DN300 with manual drive | 184 $ | Completed with lever, diameter 300 mm |
Silos breaker | 213 $ | To reduce the pressure of the material column inside the silo cone |
Cement level sensor G2 1/2 220V | 123 $ | Indicates the level of cement in silo |
Aeration system silo SC | 309 $ | For motivation air cement |
silo aeration system CMS | 345 $ | For motivation air cement |
Silo aeration system STSG | 370 $ | For motivation air cement |
silo aeration system JV | 488 $ | For motivation air cement |
ATP silo aeration system | 527 $ | For motivation air cement |
silo aeration system SPU | 529 $ | For motivation air cement |
Silo aeration system SPV | 550 $ | For motivation air cement |
Emergency pressure relief valve PV273 | 182 $ | To maintain the operating pressure within the cement silo |
Vibrator MVE 300/3 | 139 $ | For cement free falling |
CPP-600 pneumochamber pump | 6 083 $ | For the pumping of cement, precious stones and diamonds 40 tons hour |
Replacement Cartridge Set for cement filter AIRFILL-25 | 322 $ | Set of 4 pieces |
Stainless steel valve XD-YF250A NEON with set ring |
144 $ | To prevent the formation of excessive air pressure |
Silo vibrator (bunker activator) | 2 449 $ | On the silo cone, for cement activation |
Loader telescopic LB with filter | 8 249 $ | For loading cement from a silo into cement trucks |
Cement filter connection kit with pneumatic cleaning | 61 $ | To ensure the operation of the pneumatic cleaning system of cement filter cartridges |
Name | Price | Description |
---|---|---|
Screw dlya cement ⌀114 3000 | 1 696 $ | Diameter 114 mm, length 3 m |
Auger for cement ⌀1146000 | 1 766 $ | Diameter 114 mm, length 6 m |
Screw conveyor ⌀168/4,000 | 1 928 $ | Diameter 168 mm, length 4 m |
Screw conveyor ⌀168/6,000 | 2 110 $ | Diameter 168 mm, length 6 m |
Auger for cement ⌀168 7500 | 2 718 $ | Diameter 168 mm, length 7.5 m |
Screw conveyor ⌀168/9,000 | 2 852 $ | Diameter 168 mm, length 9 m |
Screw conveyor ⌀168/10,000 | 3 029 $ | Diameter 168 mm, length 10 m |
Screw conveyor ⌀168/12,000 | 3 735 $ | Diameter 168 mm, length 12 m |
Auger for cement ⌀2194000 | 2 382 $ | Diameter 219 mm, length 4 m |
Auger for cement ⌀2196000 | 2 695 $ | Diameter 219 mm, length 6 m |
Auger for cement ⌀2197000 | 3 089 $ | Diameter 219 mm, length 7 m |
Auger for cement ⌀2197500 | 3 268 $ | Diameter 219 mm, length 7.5 m |
Auger for cement ⌀2199000 | 3 585 $ | Diameter 219 mm, length 9 m |
Auger for cement ⌀21910000 | 3 557 $ | Diameter 219 mm, length 10 m |
Screw dlya cement ⌀219 11500 | 4 241 $ | Diameter 219 mm, length of 11.5 m |
Auger for cement ⌀21912000 | 4 483 $ | Diameter 219 mm, length 12 m |
Auger for cement ⌀21913000 | 4 744 $ | Diameter 219 mm, length 13 m |
Auger for cement ⌀21915000 | 5 287 $ | Diameter 219 mm, length 15 m |
Screw conveyor ⌀273/6,000 | 3 456 $ | Diameter 273 mm, length 6 m |
Screw conveyor ⌀273/9,000 | 4 374 $ | Diameter 273 mm, length 9 m |
Screw conveyor ⌀273/10,000 | 4 493 $ | Diameter 273 mm, length 10 m |
Screw conveyor ⌀273/12,000 | 5 479 $ | Diameter 273 mm, length 12 m |
Auger for cement ⌀27313000 | 5 805 $ | Diameter 273 mm, length 13 m |
Auger for cement ⌀27315000 | 6 818 $ | Diameter 273 mm, length 15 m |
Auger for cement ⌀32310000 | 6 705 $ | Diameter 323 mm, length 10 m |
Auger for cement ⌀32312000 | 7 432 $ | Diameter 323 mm, length 12 m |
Name | Price | Description |
---|---|---|
Vibropress Ultra Mini | 7 585 $ | Mini vibropress without hopper for small concrete products |
Vibropress Ultra Mini with bunker | 8 535 $ | Compact vibropress with hopper for small concrete products |
Vibropress ULTRA Mini with module | 12 268 $ | Compact vibropress module feeding a concrete mixture into the matrix to small concrete products |
Vibropress ULTRA Mini with conveyor | 13 876 $ | Compact concrete block press with conveyor for small-piece concrete products |
Vibropress uLTRA | 15 339 $ | Compact vibropress with hopper, feeding trays and a mixture supply module |
Vibropress Ultra 2.0 | 16 945 $ | Compact vibropress with hopper for small concrete products |
Vibropress ULTRA PRO 2.0 | 18 674 $ | Compact vibropress with hopper for small concrete products |
Vibropress Ultra 3.0 | 20 165 $ | Compact vibropress module feeding a concrete mixture into the matrix module automatic feeding pallets hydraulic lift, the second module layer |
Vibropress ULTRA 3.0+ | 26 698 $ | Compact vibrating press with a module for feeding concrete mixture into a matrix, a module for automatic feeding of pallets, a hydraulic lift, a module for the second layer, an automatic control panel. There is no manual labor. |
Name | Price | Description |
---|---|---|
STANDARD Block Making Machine | 33 951 $ | Regular vibropress with molding zone 400h1000 |
Vibropress STANDART 2.0 | 36 612 $ | Universal vibropress III dimensional group with hydraulic lift. Molding zone size 1000 x 400. |
Vibropress STANDART 3.0 | 40 307 $ | Universal vibrating press of the III size group with a “color layer” module and a hydraulic lift. The size of the molding zone is 1000 x 400. |
Vibropress STANDART Heat | 39 070 $ | Universal vibropress III dimensional group with the module "TEPLOBLOK" hydraulic lift and size of the molding zone 1000 x 400. |
Name | Price | Description |
---|---|---|
MAXIMAL Block Making Machine | 41 163 $ | Powerful vibropress for small concrete goods |
Vibropress MAXIMAL 2.0 | 47 417 $ | Powerful vibropress melkochshtuchnyh for concrete products with the receiving roller conveyer hydraulic ram for collection of pallets with finished products. |
Vibropress MAXIMAL 3.0 | 51 628 $ | Powerful vibropress melkochshtuchnyh for concrete products with the receiving roller conveyer hydraulic ram for collection of pallets with finished products and module "color layer" |
Vibropress MAXIMAL 4.0 | 49 316 $ | Stacking of finished products on a Euro pallet eliminates the use of a forklift |
Automatic line MAXIMAL on hydraulic lift |
109 388 $ | Maximum eliminates unnecessary manual operation and human factors in the production vibropressed products. |
Automatic line MAXIMAL with stackers |
110 248 $ | Maximum eliminates unnecessary manual operation and human factors in the production vibropressed products. |
Automatic line MAXIMAL with stackers and robot loader |
157 091 $ | Maximum eliminates unnecessary manual operation and human factors in the production vibropressed products. |
Name | Price | Description |
---|---|---|
Vibropress OPTIMAL | 23 812 $ | Universal vibrating press of the II size group with the size of the molding zone 800 x 400 |
Vibropress OPTIMAL 1.5 | 26 941 $ | Universal vibrating press of the II size group with the size of the molding zone 800 x 400 |
Vibropress OPTIMAL 2.0 | 25 616 $ | Universal vibrating press of the II size group with the size of the molding zone 800 x 400 |
Vibropress OPTIMAL 3.0 | 28 744 $ | Universal vibrating press of the II size group with the size of the molding zone 800 x 400 |
Name | Price | Description |
---|---|---|
NESUSHKA movable Block Making Machine | 25 840 $ | Mobile vibropress |
NESUSHKA Block Making Machine with Loader | 28 691 $ | Mobile vibropress with Loader |
Name | Price | Description |
---|---|---|
Vibropress for PEGAS FBS blocks | 47 728 $ | For the production of CFC blocks with a hopper and a loading compartment |
Vibropress PEGAS with bucket | 33 502 $ | For production of FBS blocks |
Vibropress PEGAS-2 for FBS blocks | 49 161 $ | For the production of CFC blocks with a hopper and a loading compartment |
Vibrocompressor PHOENIX PL for plates and blocks | 60 994 $ | For the production of PL slabs and blocks the hopper and the loading compartment |
Name | Price | Description |
---|---|---|
Vibropress KS15 | 13 578 $ | For the production of rings KS7, KS10, KS15 |
Vibropress KS | 14 638 $ | For the production of all types of rings KS7, KS10, KS15, KS20 |
Vibropress KS15 with slipform | 27 910 $ | For the production of rings KS7, KS10, KS13, KS15, with a concrete paver for uniform loading of the mold with the finished mixture |
Вибропресс КС с бетоноукладчиком | 28 952 $ | For the production of all types of rings KS7, KS10, KS13, KS15 and KS20 with a concrete paver for uniform loading of the mold with the finished mixture |
Name | Price | Description |
---|---|---|
Stone splitting press 10 tons, 400 mm | 2 151 $ | For splitting stones (force 10 tons) |
Stone splitting press 20 tons, 400 mm | 3 695 $ | For splitting stones (20 tonnes of force) |
Stone splitting press 60 tons, 800 mm | 6 580 $ | For splitting stones (60 tonnes of force) |
Stone splitting press 80 tons, 800 mm | 7 748 $ | For splitting stones (80 tonnes of force) |
Stone splitting press 80 tons, 1200 mm | 9 722 $ | For splitting stones (force of 80 tons, a knife) |
Name | Price | Description |
---|---|---|
ULTRA line with BP-1G-300 + LK 5-05 | 20 535 $ | Pressing line based on vibropress Ultra and BP-1G-300 + LK 5-05 |
ULTRA line with BP-2G-375S on the overpass | 29 902 $ | Pressing line based on the Ultra vibropress with BP-2G-375S on the overpass |
ULTRA line PD-2G-375C on base + LK 5-05 |
31 093 $ | Pressing line based on the Ultra vibropress with BP-2G-375S on a stand + LK 5-05 |
ULTRA line with MOBIL-20 + LK 5-0.5 | 52 455 $ | Pressing line based on the Ultra vibropress with MOBIL-20 + LK 5-0.5 |
ULTRA line with COMPACT-20 | 52 766 $ | Pressing line based on the Ultra vibropress with the COMPACT-20 concrete plant |
Line OPTIMAL 2.0 with BP-1G-300 + LK 6-0.5 | 30 526 $ | Pressing line based on vibropress OPTIMALS with BP-1G-300 + LK 6-0.5 |
OPTIMAL 2.0 line with Mini-RBU-10 | 38 234 $ | Pressing line based on the OPTIMAL vibropress with Mini-RBU-10 |
OPTIMAL 3.0 line with BP-1G-300, LK 6-0.5 and BP-1G-100, LK-5-0.5 |
38 206 $ | Pressing line based on the OPTIMAL 2.0 vibropress with BP-1G-300, LK 6-0.5 and BP-1G-100, LK-5-0.5 |
STANDARD line with BP-2G-375S on the overpass |
47 582 $ | Press line based on the STANDARD vibrating press with a live roll and with BP-2G-375S on a flyover |
STANDARD line with BP-2G-375S on a stand + LC 7-0.5 |
49 261 $ | Press line based on the STANDARD vibrating press with a roller table with BP-2G-375S on a stand + LK 7-0.5 |
STANDARD line with MOBIL-20 + LK 7-0.5 |
70 623 $ | Press line based on STANDART vibrating press with roller table with MOBIL-20 + LK 7-0.5 |
STANDARD line CD-20 |
70 449 $ | Press line based on the STANDART vibropress with a roller table with COMPACT-20 |
MAXIMUM 2.0 line with BP-2G-375S on the overpass |
60 377 $ | Pressing line based on the MAXIMAL vibropress with a hydraulic lift from BP-2G-375S |
MAXIMUM 2.0 line with BP-2G-375S on a stand + LC 7-0.5 |
62 057 $ | Press line based on the MAXIMAL vibrating press with a hydraulic lift with BP-2G-375S on a stand + LK 7-0.5 |
MAXIMUM 2.0 line with MOBIL-20 + LK 7-0.5 |
83 418 $ | Pressing line based on MAXIMAL vibropress with concrete plant MOBIL-20 + LK 7-0.5 |
MAXIMUM 2.0 line CD-20 |
83 244 $ | Press line based on the MAXIMAL vibrating press with a hydraulic lift with COMPACT-20 |
Name | Price | Description |
---|---|---|
LK 3-0,5 Belt Conveyor | 2 177 $ | Length 3 m, width 0.5 m. Smooth tape |
LK 5-0,5 Belt Conveyor | 3 029 $ | Length 5 m, width 0.5 m. Smooth tape |
Belt conveyor LC 7-0.5 | 3 543 $ | Length 6 meters, width 0.5 m.Smooth tape |
LK 8-0,5 Belt Conveyor | 3 966 $ | Length 8 m, width 0.5 m. Smooth tape |
LK 8-0,8 Belt Conveyor | 5 602 $ | Length 8 m, width 0.8 m. Smooth tape |
LK 10-0,5 Belt Conveyor | 5 096 $ | Length 10 m, width 0.5 m. Smooth tape |
LK 10-0,8 Belt Conveyor | 7 116 $ | Length 10 m, width 0.8 m. Smooth tape |
LK-16-0,6 Belt Conveyor | 11 070 $ | Length 16 m, width 0.6 m. Chevron tape |
LK-18-0,8 Belt Сonveyor | 13 487 $ | Length 18 m, width 0.8 m. Chevron tape |
Belt conveyor LK-21-1 | 23 961 $ | Length 21 m, width 1.0 m. Chevron belt |
Name | Price | Description |
---|---|---|
Pole Position L25P Compressor | 393 $ | Receiver volume 24 l, capacity 240 l/min |
Compressor B5200B/200 CT4 | 1 639 $ | Receiver volume 200 l., pr-t 530 lmin |
ABAC B 5900B/200 СТ 5,5 Compressor | 1 991 $ | Receiver volume 200 l, capacity 653 l/min |
ABAC B 6000/270 CT 7,5 Compressor | 2 482 $ | Receiver volume 270 l, capacity 827 l/min |
Name | Price | Description |
---|---|---|
Pumped Calpeda NM 40/12 F / A | 937 $ | For water supply (1.1 kW, 30 cu m per hour) |
Pumped Calpeda NM 50/12 F / B | 1 273 $ | For water supply (2.2 kW, 60 cu m per hour) |
Pump Calpeda NM 65/12 C / B | 2 396 $ | For water supply (5.5 kW, 120 cu m per hour) |
Pump Calpeda MXH 202E | 480 $ | For chemical additives supply (0.33 kW, 4.25 cu m per hour) |
Name | Price | Description |
---|---|---|
215 821 | 60 976 $ | 215 821 |
215 821 | 77 337 $ | 215 821 |
Block-modular boiler house BMKT-0.7 | 91 565 $ | 215 821 |
Block-modular boiler house BMK-1.0 | 100 102 $ | 215 821 |
Block-modular boiler house BMKT-1.5 | 98 577 $ | 215 821 |
Block-modular boiler house BMK-1.5 | 137 703 $ | 215 821 |
Steam generator PG-500 on the shoulder | 7 667 $ | heating steam |
Steam generator PG-500 in a block container | 11 462 $ | 58 851 |
PG-1000 steam generator on frame | 10 924 $ | heating steam |
PG-1000 Steam Generator in portacabin | 16 496 $ | PG-1000 is a block in a warm box |
Steam generator PG-1500 on the shoulder | 14 259 $ | heating steam |
Steam generator PG-1500 in a block container | 20 894 $ | PG-1500 in a warm block box |
Steam generator PG-2000 on the shoulder | 16 494 $ | heating steam |
Steam generator PG-2000 in a block container |
23 133 $ | 58 851 |
Steam generator (medium pressure) PGSD-500 |
25 920 $ | Medium pressure steam generator. Steam heating |
Steam generator (medium pressure) PGSD-1000 0.6 MPa | 21 201 $ | Medium pressure steam generator. Steam heating |
Steam generator (medium pressure) PGSD-1000 0.6 MPa in a block container | 32 215 $ | Medium pressure steam generator. Steam heating |
Steam generator (medium pressure) PGSD-1000 | 32 324 $ | Medium pressure steam generator. Steam heating |
Steam generator (medium pressure) PGSD-1000 in a block container | 44 626 $ | Medium pressure steam generator. Steam heating |
Steam generator (medium pressure) PGSD-2000 | 39 322 $ | Medium pressure steam generator. Steam heating |
Steam generator (medium pressure) PGSD-2000 in a block container | 50 929 $ | Medium pressure steam generator. Steam heating |
TGV-250 Hot Air Heat Generator on frame | 16 780 $ | Heating inert |
Heat generator TGV-250 for heating | 17 622 $ | Hot air heating |
Heat generator TGV-250 in a block container | 20 696 $ | Heating inert, in block box |
Heat generator TGV-450 on a frame | 19 563 $ | Heating inert |
Heat generator TGV-450 for heating | 16 360 $ | Hot air heating |
Heat generator TGV-450 in a block container | 25 118 $ | Heating inert, in block box |
Heat generator TGV-450 for heating in a block container | 21 915 $ | Heating with hot air, in block box |
Heat generator TGV-600 on a frame | 27 070 $ | Heating inert |
Heat generator TGV-600 for heating | 24 796 $ | Hot air heating |
Heat generator TGV-600 in a block container | 33 394 $ | Heating inert, in block box |
Heat generator TGV-600 for heating in a block container | 31 013 $ | Heating with hot air, in block box |
Heat generator TGV-800 | 38 620 $ | Heating inert |
Heat generator TGV-800 for heating | 37 344 $ | 115 319 |
Heat generator TGV-1000 | 46 240 $ | Heating inert |
Industrial heater 1.2 MW | 40 142 $ | 115 319 |
Hot water boiler KVA-0.1 Gn/LZh | 3 735 $ | For heating heat carriers up to 105 ° С |
Hot water boiler KVA-0.25 Gn/LZh | 5 624 $ | For heating heat carriers up to 105 ° С |
Hot water boiler KVA-0.5 Gn/LZh | 7 013 $ | For heating heat carriers up to 105 ° С |
Hot water boiler KVA-0.7 Gn/LZh | 9 327 $ | For heating heat carriers up to 105 ° С |
Hot water boiler KVA-1.0 Gn/LZh | 13 627 $ | For heating heat carriers up to 105 ° С |
Hot water boiler KVA-2.0 Gn/LZh | 21 271 $ | For heating heat carriers up to 105 ° С |
Hot water boiler VK-5 | 13 178 $ | For heating and storing water |
Hot water boiler VK-5 in a block container |
17 995 $ | In a block box. For heating and storing water |
Hot water boiler VK-7 | 15 953 $ | For heating and storing water |
Hot water boiler VK-7 in a block container |
20 759 $ | In a block box. For heating and storing water |
Hot water boiler house VK-10 | 17 366 $ | For heating and storing water |
Hot water boiler house VK-10 in a block container |
22 933 $ | In a block box. For heating and storing water |
Thermal oil boiler KTM-0.15 Pump Base | 14 467 $ | For heating thermal oil to a temperature of +250 ° C |
Thermal oil boiler KTM-0.3 Pump Base | 16 227 $ | For heating thermal oil to a temperature of +250 ° C |
Thermal oil boiler KTM-0.5 Pump Base | 22 452 $ | For heating thermal oil to a temperature of +250 ° C |
Thermal oil boiler KTM-0.65 Pump Base | 24 698 $ | For heating thermal oil to a temperature of +250 ° C |
Thermal oil boiler KTM-1.0 Pump Base | 30 243 $ | For heating thermal oil to a temperature of +250 ° C |
Thermal oil boiler KTM-1.5 Pump High Temp | 42 854 $ | For heating thermal oil to a temperature of +350 °C |
Thermal oil boiler KTM-2.0 Pump High Temp | 60 244 $ | To warm up the satellite pipeline for supplying bitumen |
Electric thermal oil boiler KTM-0.03E | 6 759 $ | To warm up the satellite pipeline for supplying bitumen |
Electric thermal oil boiler KTM-0.1E | 11 940 $ | To warm up the satellite pipeline for supplying bitumen |
Bitumen smelter BP-2 | 10 738 $ | Melting bitumen in clovertainers |
Electric bituminous smelter BP-1E | 13 954 $ | Melting bitumen in clovertainers |
Tank for heating water BVG-4 | 2 656 $ | Tank for heating and storing water 4 m3 |
BV-7 Tank for water heating | 4 293 $ | Tank for heating and storage of water 7 m3 |
Water heating tank BVG-15 | 8 061 $ | Tank for heating and storage of water 15 m3 |
Water heating tank BVG-25 | 9 544 $ | Tank for heating and storing water 25 m3 |
Horizontal steel tank RGS-15 | 4 573 $ | Water storage tank 15 m3 |
Horizontal steel tank RGS-25 | 8 892 $ | Water storage tank 25 m3 |
Horizontal steel tank RGS-45 | 11 433 $ | Water storage tank 45 m3 |
Name | Price | Description |
---|---|---|
Operator's cab | 1 890 $ | Basic operator cabin |
Enlarged Operator Cab (luxury version) | 4 051 $ | Enlarged size of operator's cab, increased view ability, air conditioning, heating, furniture (new) |
Hopper cover kit with automatic drive DK-24 |
4 815 $ | On a bunker with 2 sections. Applicable only for FLAGMAN factories |
Hopper covers with automatic drive KB-3 |
7 533 $ | On a hopper with 3 sections. Applicable only for FLAGMAN factories |
Modular sandwich cladding MSO-30 | 35 730 $ | For bins with 2 sections. Applicable only for FLAGMAN factories |
Modular sandwich cladding MSO-60 | 49 850 $ | For bins with 3 sections. Applicable only for FLAGMAN factories |
Heating silo registers ROB-2 | 1 516 $ | For bins with 2 sections Applicable only for FLAGMAN plants |
Registers hoppers heating ROB-3 | 2 312 $ | For bins with 3 sections. Applicable only for FLAGMAN factories |
Lattice for bunker section 100x100 for DK-24 to the FLAGMAN plant |
1 250 $ | For screening the coarse fraction |
Lattice for bunker section 100x100 for DK-36 (DK-54) to the FLAGMAN plant |
1 550 $ | For screening the coarse fraction |
Lattice for bunker section 70x70 for DK-24 to the FLAGMAN plant |
1 607 $ | For screening the coarse fraction |
Name | Price | Description |
---|---|---|
Supported bucket | 580 $ | Bucket on a support (1 cubic meter). Delivery with tray is possible |
Name | Price | Description |
---|---|---|
Addressable mixture dispenser - ART-1500 | 45 732 $ | Concrete bucket is designed for targeted distribution of rigid and mobile concrete mixes in production areas |
Name | Price | Description |
---|---|---|
commissioning of equipment | 5 183 $ | It includes the cost of travel, accommodation and subsistence expenses |
Installation supervision | 2 591 $ | It can only be ordered in conjunction with the commissioning |
Installation supervision of the plant with insulation | 5 183 $ | It includes travel, accommodation and travel expenses commissioning engineer. |